Miskimmin Structural Engineering performed a complete review of the rigging and stage framing for The Good Doctor production team to ensure the safety of the actors and crew.
Miskimmin Structural Engineering provided structural advice on multiple components of the venue fit-out, including the mezzanine extension over the bar and the featured (climbing) columns used by the dancers as part of the performance.
Amber Planet Drill Rig.
Spaceship Set.
This set filled two large warehouse spaces, and we actually had to increase the size of the doors between the warehouses to allow the spaceship corridor to pass through.